Weekly Update 12/06/2013

From Bob Schwartz, City Manager 

 

 Emory Asbury Water Project – We have notified Anderson Grading & Pipeline that their

    low bid was accepted at the council meeting Monday night. The contract documents are being

    prepared and will be complete before the preconstruction conference which will be held at

    8:30 AM on Wednesday December 18. We have attached a copy of the memo from Marty 

    Boyd setting up the preconstruction conference.

→ Cook Road Pressure Reducing Valve – The 12” pressure reducing valve has been installed

    and was put into service on Tuesday. The new water line is now helping to supply water to the

    southern part of the city. Jody, Scottie, and Dustin spent almost five hours with the engineer and

    the contractor as the new line and valve were put into service. This involved monitoring and

    adjusting the pressure along with opening and closing several fire hydrants. We have a schematic

    of a pressure reducing valve along with a picture of our valve (almost three feet in diameter) installed.

     

     

 Victoria Station Pump Station– We have a lift station as part of our sewage system at Victoria

    Station. The lift station contains two 2” grinder pumps. One of the pumps failed Friday morning and

    will need to be replaced at a cost of almost $3,000. Pumps in a lift station fail from time to time

    because they operate in such a difficult environment. In an attempt to get the pump started again, our

    crew removed about one 90 gallon garbage cart of grease. It’s not very appetizing, but I have included

    a picture. 

   

 Police Department – Here are the police department totals by fiscal year through November.